<!DOCTYPE html>
<html>
  <head>
    <meta http-equiv="Content-Type" content="text/html; charset=UTF-8">
  </head>
  <body>
    <p>The 76 to 81 GHz ham band is not part of the R&O or FNPRM.</p>
    <p>Ron W6RZ<br>
    </p>
    <div class="moz-cite-prefix">On 1/4/24 13:14, Michelle Thompson via
      Ground-Station wrote:<br>
    </div>
    <blockquote type="cite"
cite="mid:CACvjz2U8pV0CnjW+qw5+kUKr7hU+s98vW9co=FiHSUTgCNLMOQ@mail.gmail.com">
      <meta http-equiv="content-type" content="text/html; charset=UTF-8">
      <div dir="ltr">An item on the agenda for the January 2024 FCC Open
        Meeting is a Report and Order and Further Notice of Proposed
        Rulemaking for Modernizing and Expanding Access to the 70/80/90
        GHz Bands<br>
        <br>
        <a
href="https://docs.fcc.gov/public/attachments/DOC-399581A1.pdf"
          moz-do-not-send="true" class="moz-txt-link-freetext">https://docs.fcc.gov/public/attachments/DOC-399581A1.pdf</a><br>
        <br>
        Are there any challenges or opportunities in this for amateur
        radio or amateur radio satellite service that we (interested in
        amateur microwave bands) can comment upon? <br>
        <br>
        -Michelle Thompson<br>
        <br>
        -=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-<br>
        What the Report and Order Would Do:<br>
        • Adopts rules to allow for point-to-point links to endpoints in
        motion in the 70 GHz and 80 GHz bands under the part 101 rules,
        covering: (1) in the aeronautical space, ground-to-air and
        air-to-ground transmissions between ground stations and
        aircraft, and air-to-air transmission between aircraft in
        flight; and (2) in the maritime space, ship-to-shore,
        shore-to-ship, aerostat-to-ship, and aerostat-to-shore
        transmissions.<br>
        <br>
        • Adopts changes to FCC rules to facilitate the use of the 70
        and 80 GHz bands for backhaul, including through the use of
        smaller antennas and through adoption of a channelization plan<br>
        consistent with Recommendation ITU-R F.2006.<br>
        <br>
        • Adopts rules to improve the accuracy of the link registration
        database for the 70/80/90 GHz bands, including a requirement
        that licensees certify that each link is constructed and
        operating<br>
        within 12 months of successful registration in the link
        registration system. What the Further Notice of Proposed
        Rulemaking Would Do:<br>
        <br>
        • Seeks comment on the potential inclusion of FSS earth stations
        in the third-party database registration regime in the 70 GHz
        and 80 GHz bands, and changes necessary to implement inclusion
        of these stations.<br>
        <br clear="all">
        <div>
          <div dir="ltr" class="gmail_signature"
            data-smartmail="gmail_signature">
            <div dir="ltr">
              <div>
                <div dir="ltr">
                  <div>
                    <div dir="ltr">
                      <div dir="ltr">
                        <div dir="ltr"><br>
                        </div>
                      </div>
                    </div>
                  </div>
                </div>
              </div>
            </div>
          </div>
        </div>
      </div>
    </blockquote>
  </body>
</html>