<div dir="ltr">Greetings all!<br><br>Plenty going on. If you haven't visited Slack in a while or reviewed the Trello boards then please do.<br><br>Join Phase 4 Ground Trello board:<br><a href="https://trello.com/invite/b/REasyYiZ/8de4c059e252c7c435a1dafa25f655a8/phase-4-ground">https://trello.com/invite/b/REasyYiZ/8de4c059e252c7c435a1dafa25f655a8/phase-4-ground</a><br><br>Join Phase 4 Space Trello board:<br><a href="https://trello.com/invite/b/GRBWasqW/1336a1fa5b88b380c27ccf95d21fec79/phase-4-space">https://trello.com/invite/b/GRBWasqW/1336a1fa5b88b380c27ccf95d21fec79/phase-4-space</a><br><br>If you need a Slack invite, please write me directly and I'll help you out. <br><br>-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-<div><br></div><div>Remote Lab West: <br><br>Here's a selection of what is going on in FPGA work.<br><br>We had a review of Anshul's GSE work this past Saturday. Feedback was passed along, and more reviews of that work along with the BBFrame code is coming up. <br><br>Testing of Suoto's codebase in the lab is happening this week, with special emphasis on getting examples working from the Analog Devices evaluation board up and running. <br><br>Battery curves are accumulating and Lab Tech One is moving forward with some Jupyter Notebooks to provide some basic live analysis for curve matching. Work will be presented at Ham Expo in August.<br><br>Paul KB5MU tested two (hardware) modified MD380s loaded with OpenRTX 0.3.1 and OpenRTX 0.3.2 firmware. Results sent to OpenRTX and M17 and firmware changes are expected soon. We'll make a short video report about recent developments that includes a summary of the project. M17 doesn't work yet on these handhelds, but that's planned. M17 protocol, with some physical layer modifications, will be our native uplink protocol for the transponder. <br><br></div><div>-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-<br><br></div><div>Outreach/Meetings/Logistics:<br><br>The meeting in Huntsville, AL with the Space and Science Center went extremely well. The goal is to renovate the large inoperative dish for citizen science and amateur radio use. Thank you to Steve Conlklin for persistent and dedicated work over the past 2 years make a successful meeting with Center leadership possible. We may be able to have the first work party for this in late August. <br><br>Meeting today with QSO Today booth support to get trained on setting up our virtual exhibit in mid-August at Ham Expo. I'll send out a lot more information about the booth very soon. The Expo booth will be a place to gather and talk about things and show off the many different aspects of what we do. We are pushing hard to have some milestones done by then, so if you can help out, then step right up.<br><br>FPGA stand-up meeting Tuesday 10:00 US Pacific.<br><br>Microwave Beacon Project (AmbaSat Inspired Sensors++) meeting Wednesday 11:00 US Pacific.<br><br>Taxes! We'll need help this next time around, so we're looking for an accountant. I've written Foundation Group, who provided support for our incorporation and 501(c)(3) application, and a local non-profit accountant. If you have recommendations, please pass them along to me or the board.<br><br>There will be an in-person board meeting at DEFCON in August 2021. All project participants are welcome to attend. If you have a subject you want brought up, please send it to me or any board member. Meeting coordination will be over Slack. Board meetings happen over email or virtually quite often, but in-person meetings are something we've been looking forward to for a while. <br><br>-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-<br><br>Policy work: <br><br>non-profit specialists have been contracted to develop an internal policy for working with for-profits. Draft expected soon. We have a long-term strategy for the impact of essentially single-source funding on ORI. <br><br>-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-<br><br>Regulatory Work:<br><br>Presentation and Paper for Open Source Debris Mitigation has been completed. Will announce the meeting schedule with the FCC as soon as I get confirmation. We will present this work at Ham Expo in August. <br><br>No news yet on the Opinion Request for ITAR/EAR work. That is the last (and considered to be the least risky) of a three step process. The CJ Request and the Classification Request were both successful. <br><br>-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-<br></div><div><br></div><div>MultiMedia 10GHz Beacon:<br><br>Resuming! <br><br>-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-<br><br>Openrotor:<br><br>New volunteers, new energy, and progress. Please visit <a href="https://github.com/phase4ground/openrotor">https://github.com/phase4ground/openrotor</a> and #openrotor on Slack. <br><br>-=-=-=-=-=-=-=-=-=-=-=-=-=-=-=-<br><br>Please reply with anything we missed in this summary, or any questions you might have. <br></div><div><br><br clear="all"><div><div dir="ltr" class="gmail_signature" data-smartmail="gmail_signature"><div dir="ltr"><div><div dir="ltr"><div><div dir="ltr"><div dir="ltr">-Michelle W5NYV<br><br><div dir="ltr"><br></div></div></div></div></div></div></div></div></div></div></div>